Guide
Pizzeria opening equipment checklist
A working list for the equipment schedule your health department and building department will review before a pizzeria opens. Plan review offices ask for make and model numbers, so fill this in with real models before you submit. Requirements vary by city and county; your regulator's list wins.
Cooking line
- Pizza oven: deck, conveyor or wood-fired, sized to peak hour (buying guide, cost guide)
- Other line appliances (fryer, range, char) listed by duty class, since the highest-duty appliance under a hood sets its design (IMC 507.2)
- Hot holding equipment (ANSI-certified per Minnesota's list)
Refrigeration
- Pizza prep table and reach-ins or walk-in cooler (ANSI-certified mechanical refrigeration)
- Walk-in freezer (on Minnesota's certified list)
- Ice machine
Prep
- Stainless food-contact prep tables
- Mixer and dough equipment (ANSI marks include BISSC for bakery equipment)
- Slicer
- Food preparation sink, if your regulator requires one
Sinks and warewashing
- Handwashing sinks, 3-compartment sink, utility sink
- Dishwashing machine, if used
- Grease trap or interceptor size and location on the plumbing schedule. See grease trap service on hood day
Ventilation and fire suppression
- Type I hood over grease- or smoke-producing appliances, or UL 710B documentation for any ventless electric oven
- Make-up air and exhaust layout on the plans
- Wet-chemical suppression covering the line. See suppression vs hood cleaning and Class K extinguisher placement
- Spark arrestors and monthly inspection for wood or coal ovens. See wood-fired oven hood schedule
- First hood cleaning and inspection timing. See opening a new restaurant
Smallwares
- Peels, pans and screens, cutters, dough boxes, ingredient bins, thermometers
- Health departments review these less than fixed equipment; specific requirements: Unknown, ask your inspector
Permits and inspections
| Step | What to bring |
|---|---|
| Health plan review | Layout drawing, equipment schedule with make and model, NSF or equivalent certification, finish and plumbing schedules, menu |
| Building and mechanical permits | Hood and duct design, oven listing (UL 2162 for wood), UL 710B report for ventless |
| Fire marshal | Suppression permit and acceptance test; fees vary by city (see researching your city's fees) |
| Pre-opening health inspection | Equipment installed as approved, hot water, sinks stocked |
Permit fees and review timelines: Unknown here; they are set locally. Our metro directory has fee details for covered cities.
Sources
- Minnesota Dept. of Agriculture — plan review step 4: equipment (ANSI sanitation certification list; used equipment approval criteria)
- Anne Arundel County Health Dept. — structural plan review (equipment list with make/model; NSF or equivalent)
- Iowa Food Protection Task Force — plan review guide (2025) (ANSI-certified equipment deemed to meet Food Code Parts 4-1 and 4-2)
- Minnesota Rules 1346.0507 (IMC 507.2 as adopted) (Table 507.2.1 duty classes: deck oven light duty; gas conveyor and electric conveyor 6 kW+ medium duty; solid fuel extra-heavy)
- NYC Buildings — solid fuel cooking appliances (MC 917: UL 2162 listing; unlisted custom ovens may need field evaluation)
- USA Restaurant Suppliers — pizza oven buying guide: deck vs conveyor vs brick (dealer-published; format table, peak-hour sizing, 10-year cost examples)
Next step
Turn this list into your equipment schedule with model numbers, attach cut sheets, and get a hood and suppression quote before plan review submission.
Equipment buyers: use the form below and mention your oven or other equipment needs in the notes. Hood Clean Index does not sell ovens or equipment. We may earn a commission if you buy through links on this page.
Get quotes from local hood cleaners
Tell us about your kitchen and we'll pass the request to up to 3 local providers in your area. No cost to you, no obligation.