A bank of fryers running lunch and dinner (or longer) loads the exhaust path with oil vapor fast. Operators often ask for a “fryer schedule” as if NFPA names fryers in Table 12.4. It doesn’t — but secondary sources still put deep-fryer lines in the high-grease / high-volume planning bucket when hours and vapor match.

Short answer Use NFPA 96 Table 12.4’s high-volume row (secondary cite: quarterly inspection for 24-hour cooking, charbroiling, or wok cooking) as your planning floor when the fryer line runs heavy hours or shares a hood with those appliances. Budget a full-system clean at most quarterly visits — filters alone between visits won’t keep ducts under threshold. Your AHJ’s adopted edition wins.

Where a fryer line sits on the table

SituationPlanning rowWhy
Fryers under same hood as charbroil / wok / 24-hour cooklineHigh-volume → quarterly inspectionTable examples name those operations; the whole system follows the tightest cooking type it serves
Dedicated heavy fryer bank, long daily hours, continuous oil vaporPlan as high-volume / quarterly unless AHJ says otherwiseSecondary equipment tables treat deep fryers as high grease production
Light fry use in an otherwise moderate sit-down kitchenLikely moderate → semiannual inspectionDon’t invent a stricter row — but don’t ignore grease depth at inspection
Any solid-fuel appliance on the same exhaustSolid-fuel → monthlySolid fuel overrides a fryer-only quarterly plan

90-day planner (one quarter)

WhenOwner / staffVendor / inspector
Daily / nightlyWash or swap grease filters; empty drip cups; note any fan vibration or grease smell on the roof—
WeeklyCheck grease drip containers (secondary sources cite weekly for drip pans / cups under NFPA 96)—
Day 1 of quarterConfirm visit date; send written scope (hood, filters, plenum, ducts, fan, containment)Schedule inspection; bring depth gauge / comb if they measure on site
Visit dayStaff access: keys, roof hatch, after-hours if neededInspect; clean when thresholds crossed; service label on hood; photos of path
Within ~2 weeksFile report + photos; set next-due on wall calendarWritten inspection/cleaning report to owner (secondary cite: two-week report window)
Mid-quarterSpot-check filters and rooftop containment; don’t wait for the sticker if grease is pouring past filtersCall-back only if you escalate

What good quarterly looks like

  • Calendar locked to cooking type, not “whenever the vendor has a truck free”
  • Staff filter discipline between visits so ducts don’t get the whole load
  • Full path cleaned when inspection finds threshold grease — not canopy-only
  • Suppression ITM stays on its own ~6-month cycle (different vendor, usually)

What breaks the plan

  • “We do fryers twice a year” with no inspection report
  • Filters left saturated for weeks — grease bypass into ducts
  • Quote that omits ducts and rooftop fan
  • Assuming fryer oil pickup company = hood cleaner

Put this on the bid email

Who it’s for / not for